On-going surveying for property acquisition and engineering design surveys of re-routing of Buffalo Bayou north of downtown Houston between North Main Street and McKee Street. Services to be provided include “soundings” for Buffalo and White Oak Bayous.
EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.
EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.
Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.
As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.
EHRA offered its Landscape Architectural services to complete a Parks and Trails Master Plan for the District.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
In this episode Councilmember Joel Castro (City of Alvin), Councilmember Dan Davis (City of Manvel), and Councilmember Adrian Hernandez (City of Pearland) join EHRA Engineering's Chau Bao, P.E. and Sivaji Senapathi, P.E. to discuss several topics including each of the City Councilmembers’ backgrounds, future development, and the impact of the COVID-19 crisis and the related challenges facing their respective cities.
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Youtube: https://www.youtube.com/watch?v=x_q6iGkLEzc&feature=youtu.be
Apple Podcasts: https://podcasts.apple.com/us/podcast/conversations-with-councilmembers-alvin-manvel-pearland/id1510275287?i=1000477627524
Spotify: https://open.spotify.com/episode/1ukVshXBXN6mLZilXf4qKF?si=HdGXp4lMTpO6E9mUCwInag
Pocketcasts: https://pca.st/hlr1j9r4
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!9bf61