A 720-acre gated master planned community located off Telge Road, just north of Willow Creek. See how EHRA was involved in this project.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing. Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.
EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
A Conversation with Fort Bend County Commissioners Andy Meyers & Grady Prestage
In this episode EHRA Engineering's Jim Russ (President and CEO) and Sivaji Senapathi, P.E. (Practice Area Leader -Traffic & Transportation) are joined by Commissioners Andy Meyers (Precinct 3) and Grady Prestage (Precinct 2) to discuss several topics surrounding the effects of COVID-19 in Fort Bend County as well as area growth.
Youtube: https://youtu.be/HOgoWVX1m2E
Anchorfm: https://anchor.fm/the-ground-down/episodes/A-Conversation-with-Fort-Bend...