In 2010, Harris County began improvements to roadways adjacent NWHCMUD 6. Altering West Greens Road into a cul-de-sac provided an opportunity to extend the existing trail system along Greens Bayou further west. This extension provided over 900 linear feet of additional trail for District residents. The 8-foot wide, 1,500 linear feet of trail was constructed of 6-foot decomposed granite and 2-12 inch concrete curbs to match the existing trail. Additional amenities along the trail include benches, litter receptacles, and native landscaping.
Location:
Harris County, Texas (Key Map 370 Q)
EHRA’s Role:
Lead in design development, design and engineering, landscape architecture, construction phase services
Year Completed:
2011