EHRA assisted with the district creation of Montgomery County Municipal Utility District No. 126 to accommodate a ±329 acre master planned community located in northern Montgomery County in the City of Conroe, south of League Line Road, west of Longmire Road, and adjacent to Lake Conroe.
Facilities requiring expansion were also common wall construction, and the EHRA team converted the facilities into aerobic digesters and sludge thickeners.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
EHRA was selected by the client to provide engineering design and to serve as District Engineer for the 2,400 acre Towne Lake Development. Our survey department retraced the overall boundary and performed a topographic survey of the site.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
A few intersections in the Houston area may be getting traffic and safety improvements in the near future. LINK Houston, in partner with Bike Houston, will be conducting the audit to identify problematic intersections.
“Audit team members will be looking at traffic counts along with the times of day that crashes occur. At each intersection they’ll also observe pedestrian signals, how long it takes to safely cross the street, and how cyclists use the roadway” stated by Roads & Bridges.
To see which intersections will be getting audited, click here.